Dr. Frank J. Hayden Secondary School, Burlington ON
New construction 3-story, 208,900 square-foot 9-12 secondary school, community centre and library.
- Two non-condensing gas fired heating boilers
- Five gas fired domestic water heaters with recirculating water pumps
- Hot water distribution system
- Radiant floor heating system
- Seven fan powered variable air volume terminal units
- A thermo active building system (TABS) to heat and cool classrooms, administration and library
- TABS combine high efficiency rooftop equipment with pre-cast concrete slabs
- Seven heat/cool rooftop units recirculate air through the hollow cores of pre-cast concrete slabs
- Two variable air volume heat/cool rooftop systems supply air to fan powered terminal units
- One constant volume heat/cool rooftop system serves variable volume-temperature dampers
- Ten heat/cool rooftop systems (single zone constant air volume)
- Two rooftop heating & ventilating systems
- Two dedicated outdoor air handling units with energy recovery wheel
- One gas fired make-up air unit
- Delta Controls building automation system
Martin Street Public Elementary School, Milton
New construction 2-story, 76,100 square-foot JK-8 elementary school.
- Two condensing gas fired heating boilers
- One evaporative fluid cooler
- One gas fired domestic water heater with recirculating water pump
- Variable flow heat pump loop water distribution system
- One dedicated outdoor air handling units with heat recovery pipe
- Forty-nine heat pump units
- One mixed air handling unit with gas-fired burner and DX cooling
- Tridium Niagara building automation system (Distech Controls)