Jean Vanier Catholic Secondary School, Milton, ON
New construction 3-story, 191,000 square-foot 9-12 secondary school.
- Four non-condensing gas fired heating boilers
- Two glycol/hot water converters
- Four gas fired domestic water heaters with recirculating water pump
- Three air cooled scroll chillers
- Variable flow hot and chilled water distribution systems
- Ninety-nine heating/cooling fan coil units (four-pipe)
- Three dedicated outdoor air handling systems with energy recovery wheel
- Two gas fired make-up air systems
- Four heat/cool rooftop systems (single zone constant air volume)
- Eight heat/cool rooftop systems (single zone variable air volume)
- Four ductless split systems
- Johnson Controls building automation system
St. Gregory the Great Catholic Elementary School, Oakville, ON
New construction 2-story, 78,500 square-foot K-8 elementary school with child care.
- Two non-condensing gas fired heating boilers
- One glycol/hot water converter
- One gas fired domestic water heater with recirculating water pump
- One air cooled scroll chiller
- Variable flow hot water distribution system
- Two variable air volume fan systems with energy recovery wheel
- Fifty-eight fan powered variable air volume terminal units
- Three heat/cool rooftop systems (single zone variable air volume)
- One ductless split system
- Johnson Controls building automation system